An AI tool cuts a task from an hour to 20 minutes. The technology works. Multiply the saving across hundreds of employees and the business case writes itself.

But where do the 40 minutes go? The organisation might process more work, remove cost or redeploy people to something more valuable. Or the released capacity may simply disappear into an otherwise unchanged working day.

That question sits at the heart of a measurement problem most AI programmes have not yet confronted. Most business cases measure intervention value: what happens at the point where AI acts. Far fewer measure system value: what happens to the business as a result. As AI moves from assisting individuals to reshaping whole workflows, the gap between the two is where value leaks away.

That gap is already visible in the evidence. AI Adoption Research commissioned by the UK Department for Science, Innovation and Technology, published in January 2026 and based on a survey of 3,500 UK businesses, found that three-quarters of businesses using AI reported improved workforce productivity. Yet 77% had not yet seen a change in revenue since adopting AI, and only 12% reported an increase. The figures are self-reported, but the contrast is striking: productivity improvement and realised business value are not the same thing.

You can measure the wrong thing extremely accurately

Businesses are systems. Change one part and there will almost always be consequences somewhere else. Yet most AI business cases begin, understandably, with the intervention. Can this activity be automated? Can this decision be made faster? Can we reduce the time spent on this process?

These are reasonable questions, but they measure the point where AI acts, not the business.

I saw a version of this problem in healthcare. An organisation was assessing interventions across a complex patient and clinical decision-making journey. Performance was being evaluated against a relatively narrow set of expected outcomes, concentrating heavily on one primary decision-maker. When those measures failed to move as anticipated, the obvious conclusion was that the interventions were not delivering.

The problem was not necessarily the intervention. It was how the system had been defined. When we reassessed the wider patient journey and looked at who actually influenced decisions, important participants, including pharmacists, turned out to be missing from both the stakeholder map and the measures being used to judge success.

Once we widened the stakeholder analysis and revisited the KPI framework, we identified influences and potential sources of value that the original measurement approach had overlooked. What had initially looked like an unsuccessful intervention was, at least in part, a measurement problem. The challenge was not to collect more data. It was to understand how value was actually created across the wider ecosystem, and to measure that.

The same pattern appears in very different industries. In an engineering environment, for example, AI can significantly reduce the time required to analyse information or produce technical documentation. Measured at that point in the process, the productivity gain can look compelling. But if verification, quality assurance or approval remains unchanged, work simply reaches the next constraint faster. The task has accelerated; the end-to-end process has not.

In one case, value was obscured because the stakeholder system had been defined too narrowly. In the other, value was constrained because the process had been defined too narrowly. In both, the AI could be doing exactly what was expected of it while the anticipated business outcome failed to follow.

AI makes this risk greater, because its immediate effects are so easy to count. Transactions, prompts, minutes saved, cases processed: all can be measured precisely. But an organisation can measure an intervention with considerable precision and still reach the wrong conclusion if it has defined the system too narrowly.

Where value leaks

There is a second, less obvious question behind every AI saving: what happened elsewhere because that task changed?

The answer is often that the work moved, or that the saving had nowhere to go:

  • An AI agent removes five steps from a process, but those steps held controls, decisions or human checks that now have to be recreated somewhere else.
  • Thousands of hours are saved, but no economic benefit follows, because the organisation has no mechanism for using the released capacity.

In each case, the intervention succeeds, but the expected business value never arrives. That is the difference between intervention value and system value, and it explains why so many AI programmes report impressive activity alongside disappointing returns.

Medical insurance provides a good example. AI can automate elements of claims assessment or pre-authorisation, allowing straightforward cases to be processed much faster. Measured at that point, the productivity gain can look compelling. But the cases left for human teams are increasingly the complex or exceptional ones, requiring greater judgement and potentially more time to resolve. If automated decisions also generate additional clinical review, appeals or complaints, some of the apparent saving has simply moved downstream to more specialised and expensive parts of the organisation.

The same dependencies appear wherever AI meets a complex operation. Predictive maintenance may improve the ability to anticipate equipment failure, but its business value also depends on maintenance planning, resource allocation, parts availability and customer service obligations. AI may accelerate the preparation of complex tenders, but the commercial benefit depends on pricing, technical expertise, account management and the organisation’s ability to deliver what it promises.

In my experience, the exposure is greatest in utilities, industrial technology and healthcare. All three involve significant interdependencies between technology, people, operational processes and external stakeholders. They also frequently operate with legacy infrastructure, specialist expertise and established ways of working that cannot simply be bypassed through automation. The greater the complexity of the dependencies, the more important it becomes to measure AI value across the end-to-end system rather than at the point of intervention.

The AI may still be creating significant value. But measuring at the point of automation will not tell you how much. To understand the real return, the organisation has to follow the work, cost and outcomes through the whole system, and not stop where the technology stops.

When value falls between the gaps

If system value matters, someone has to own it. In many organisations, no one does.

The technology team reports a successful deployment. The operational team reports increased productivity. The finance team cannot identify where the anticipated economic benefit has materialised. All three assessments may be accurate within their own boundaries, yet the organisation has still failed to realise the expected return.

AI value becomes nobody’s responsibility when everyone is accountable for a different definition of success.

Each function has an essential role. The CFO validates the economic case, challenges assumptions and distinguishes theoretical productivity from realised financial benefit. The COO understands how workflows, operating models, capacity and cross-functional dependencies must change for those benefits to materialise. Technology leaders deliver the capability, but successful implementation does not, by itself, guarantee business value.

The solution is not necessarily another layer of governance. It is clearer accountability for the end-to-end outcome, supported by measures that connect technological performance, operational change and financial results. Ultimately, accountability for AI value should sit with the business leader responsible for the outcome being improved: one accountable owner, even when delivering that outcome requires coordinated action across finance, operations, technology and the wider business.

What getting it right looks like

Measuring system value is not only about avoiding disappointment. It changes what an organisation sets out to build.

I was involved in a CEO-mandated initiative at a major global biotechnology company to develop a global AI and digital innovation strategy. The challenge was not simply to identify promising technologies, but to establish the foundations that would allow successive innovations to be developed, integrated and scaled across the business.

That meant building a shared digital backbone, with large-scale data management and the ability to integrate substantial volumes of real-world and longitudinal data, capable of supporting multiple applications from advanced analytics and biomarker discovery to digital diagnostics. Alongside it, we established nine global innovation hubs to identify and evaluate emerging companies and accelerate partnerships with them.

Crucially, each hub had performance dashboards aligned with the organisation’s global AI requirements, and early pilot projects were used as templates to test new KPIs and assess wider system impact. Rather than judging success solely through the performance of individual applications, the framework considered strategic alignment, organisational readiness, partnership capability, integration and the wider outcomes innovation was intended to deliver.

The strategic architecture and investment roadmap were established and implementation had begun. The longer-term financial and clinical benefits were not yet fully measurable at that stage. But the fundamental shift had already happened: from evaluating individual technologies to building a repeatable organisational capability, where innovation could be repeated rather than reinvented.

The value of AI is not simply what an individual technology enables, but what the organisation becomes capable of doing differently as a result.

Five tests for system value

Organisations don’t need more AI activity, more metrics or more governance. They need a clear line of sight from the intervention to the business outcome. These five tests show whether that line of sight exists.

  1. Start with the business outcome, not the AI use case. The starting point isn’t what the technology can automate, but what the organisation is trying to improve. If the intended outcome can’t be stated clearly, measuring AI return on investment will create precision without clarity.
  2. Define how the benefit becomes value. Time saved is not automatically value created. Productivity needs a destination, whether that’s greater throughput, better service, more revenue, lower cost or avoided recruitment. Make that mechanism explicit before the intervention scales.
  3. Measure beyond the point of intervention. Follow the change into adjacent processes. Where did the bottleneck move? Did exceptions increase? Was work pushed to more expensive people? A local efficiency gain is not enterprise value until its downstream effects are understood.
  4. Value what you are removing, not only what you are saving. Automated activity may carry judgement, institutional knowledge, informal controls and learning as well as cost. Those capabilities don’t justify keeping the old structure, but they do need to be identified and deliberately replaced.
  5. Treat scale as a transformation decision, not a technology decision. A pilot proves that something works under particular conditions, and scaling changes those conditions. The question is not whether the technology is ready to scale, but whether the organisation is ready to change around it.

Together, these tests move the question from “Did the intervention work?” to “Did it improve the performance of the system it operates in?”

Where to start

My starting point with any leadership team is not the technology. It is the business question. What is the organisation trying to achieve? Why does that outcome matter? How is success currently measured, and what assumptions underpin the expected value?

From there, I look at the wider system in which that outcome is produced: the stakeholders involved, how decisions are made, the dependencies between functions, existing capabilities and the barriers to change.

One of the most important questions is whether the problem has been defined correctly. If the original business question is too narrow, the resulting AI investment and performance measures are likely to be equally narrow.

The value of an AI intervention is partly determined before it is ever deployed. It is shaped by the quality of the underlying data, the architecture through which information moves, the governance applied to it and the organisation’s ability to integrate new capabilities into existing workflows.

Is your business working better because of it?

Revenue, margin, productivity, quality and cost all still matter. What needs to change is the boundary those measures are drawn around.

In most areas, the challenge is no longer proving that AI can work. That has largely been demonstrated. The management challenge now is ensuring that what works technically also works economically and organisationally. That often means holding the pressure for short-term returns in balance with the longer-term investment in infrastructure, capability and change that sustainable value requires.

That is not extra bureaucracy around AI. It is the discipline that turns technological capability into sustainable business performance, and it is ultimately the distinction between adopting AI and creating business value from it.

The question for leaders is no longer simply “Is our AI working?” It is “Is our business working better because of it?”

The AI Executive Review gives leadership teams a structured, independent assessment of whether their AI ambitions, investments and organisational capabilities are aligned with measurable business outcomes. It covers strategic alignment, governance and accountability, operating models, organisational readiness, adoption, delivery capability and the mechanisms through which benefits will be realised. The result is an evidence-based view of the current position, key risks and opportunities, the gaps between AI ambition and organisational capability, and a prioritised roadmap for action.

Contact Suzanne

CONTACT US TO FIND OUT HOW WE CAN HELP

Contact us

From Diagnosis to Momentum: Building the Business Case and the Plan to Turn Around a Struggling UK Operation

Outcomes

Priority improvement opportunities were identified, quantified, and agreed with all stakeholders — providing the evidence base for investment in a structured improvement programme. A programme of work was shaped to tackle the operational shortcomings identified across production, logistics, technical, and commercial functions. Programme governance, joint team resourcing, and ways of working were defined to accelerate the pace of change. Management capability to implement and sustain change was assessed, with an implementation approach developed to deliver results while simultaneously addressing the capability gaps identified.

Our Client

The UK business of a global plastics products manufacturer, operating in a depressed market and underperforming against both its own targets and its competitors. The business had recently consolidated two previously separate operations, but the integration had been poorly executed, leaving a legacy of operational inefficiency, service issues, and a workforce characterised by silo working, poor communication, and low morale. A track record of failed improvement initiatives had compounded the challenge, making management sceptical and the organisation resistant to yet another change programme.

Background

The problems were structural and interlocking. Poor integration of two businesses had created operational inefficiencies that tough market conditions were making increasingly costly to sustain. The business was losing ground to competitors, carrying excess capacity against a high fixed cost base, and running broken planning processes that were driving excessive inventory levels. Production inefficiencies were compounding the cost pressure, and a history of poorly executed initiatives had left the management team without the confidence or capability to drive improvement themselves.

What the business needed was not another programme imposed from the outside, but an honest assessment of where it stood, a credible and agreed quantification of what improvement was achievable, and a plan that the management team could own and lead.

Curzon Approach

Curzon conducted a structured analysis of current production, logistics, technical, and commercial operations, designed to surface inefficiencies and articulate the improvement potential clearly and credibly. The diagnostic was not treated as an internal exercise: opportunities were quantified and the benefits agreed with all stakeholders before a single workstream was designed, ensuring that the programme that followed was built on a foundation of shared understanding rather than consultant-led assertion.

Assessing management capability to implement change was treated as a first-order priority alongside the operational analysis. In a business with a track record of poor initiative execution, understanding the people and capability dimension was as important as understanding the operational one. The implementation approach was designed to deliver early results while simultaneously beginning to address the capability challenges that had caused previous programmes to stall.

Enrolling the management team as leaders in the improvement programme rather than subjects of it was central to the design from the outset, reflecting Curzon’s experience that the difference between a programme that lands and one that fails is rarely the quality of the analysis.

CASE STUDIES
Read some of the client problems we have solved!

From 50% Utilisation to a Doubling of Return on Sales: Creating Commercial Focus in a Technical Business

Outcomes

Staff utilisation rose steadily from around 60% to 74% and was still climbing at the close of the engagement. Return on Sales doubled as a result, and cash flow improved by 90%. The business exceeded its profit target for the financial year. Senior management adopted the Target Operating Model template as the basis for their annual planning and performance management framework, and staff surveys reported a more positive trend and a “general atmosphere of success.”

The Managing Director said: “Roke had previously been subject to a number of change programmes that had been imposed on the organisation. The key to Curzon’s success was their ability to work with the Roke Leadership Team and involve many members of staff in the design and implementation. At the core was a joint understanding of the need to develop a much more proactive culture of performance at the individual and business level. We now focus on our customers, internal as well as external.”

Our Client

A specialist engineering consultancy providing sensitive, highly technical solutions to government and defence organisations. The business had the technical credentials and the client relationships that its market demanded, but its operating model had not kept pace with its commercial ambitions. A multi-layered command-and-control structure was suppressing accountability at every level, and billable utilisation of its highly skilled and expensive people had become unsustainably low.

Background

In a good week, utilisation reached 60%. At its worst it fell below 50%. For a business whose revenue and profitability depended entirely on deploying skilled people against billable work, those numbers represented a fundamental structural problem. Most projects were overdue and over budget, and insufficient responsibility was being taken for budgets, customer engagement, delivery, and team performance across the organisation.

Previous change programmes had been imposed on the organisation rather than developed with it, and a resistance to change had taken root as a result. Any new initiative would need to overcome that legacy before it could begin to address the operational issues beneath it.

Curzon Approach

Curzon began with a root-and-branch business review, identifying opportunities to reduce direct costs and increase the deployment of billable staff simultaneously. The additional capacity unlocked would serve a dual purpose: clearing a backlog of overdue work and creating the headroom to win and deliver additional sales revenue within the year.

A Target Operating Model was designed covering processes, organisation, locations, information systems, suppliers, and management, giving the business a coherent blueprint for how it needed to operate rather than a piecemeal set of fixes. Resourcing control was centralised to make the allocation of people to work a more open, structured, and accountable process. Role-specific utilisation targets were modelled and set, establishing for the first time a clear performance expectation at the individual level. Sales and operations planning principles, drawn from manufacturing discipline, were introduced to bring the same rigour to white-collar working that the best operational businesses apply on the shop floor.

Throughout, the engagement was conducted with the organisation rather than done to it. Extensive communication at every level ensured the trust, input, and ownership that previous programmes had failed to achieve. The distinction mattered: where imposed change had repeatedly stalled, a co-designed transformation delivered results that senior management then adopted as the permanent framework for running the business.

CASE STUDIES
Read some of the client problems we have solved!

Out-of-the-Box Procurement Thinking: £5.1m Saved Across 30 Spend Categories

Outcomes

The programme delivered £5.1 million in annualised cost savings across more than 30 spend categories spanning IT, HR, facilities management, professional services, fleet, telecoms, and operational expenditure. Over 80 ideas were generated across 20 workshops, with more than 80 key suppliers engaged throughout the process. Quick wins of over £0.5 million were delivered within the first few weeks, providing immediate momentum. The CEO said: “The Curzon team approached the complex task with energy and professionalism, which was key to the ultimate success of the programme. The technical knowledge and capability of the Curzon team were clear from the start of the engagement and we had total faith in their capability to deliver the ambitious goals they had been set. Marston would recommend Curzon to anyone who requires the domain knowledge and experience of a capable consulting partner.”

Our Client

The UK leader in law enforcement and recovery services, employing over 4,700 people and recovering more than £850 million each year on behalf of the taxpayer, as well as serving private and commercial clients. The organisation had embarked on an ambitious transformation journey to achieve substantial growth and EBITDA improvement, and engaged Curzon to conduct a comprehensive review of all external expenditure and identify and deliver material cost savings.

Background

Operating at significant scale across a complex, multi-division structure, the business had accumulated a fragmented and largely unoptimised procurement base. Spend categories had grown organically across divisions without the benefit of cross-business coordination, supplier rationalisation, or systematic commercial challenge. In an increasingly inflationary environment, the cost of inaction was rising, and the business needed a partner with the procurement expertise and commercial creativity to find savings that internal teams had not been able to unlock themselves.

Curzon Approach

Curzon moved at pace from the outset, conducting a rapid opportunity assessment to define the savings landscape before committing to a structured delivery plan. Rather than applying a single procurement lever, Curzon deployed six distinct approaches across the category portfolio, each selected for where it would have the greatest impact.

Quick win workshops engaged key suppliers rapidly to surface immediately implementable cost reduction ideas, delivering £0.5 million within the first few weeks and establishing the credibility of the programme early. Structured go-to-market and tendering activity was then applied to categories with the strongest competitive opportunity, using advanced negotiation techniques including e-Auctions across complex categories such as IT, temporary labour, and others.

Demand management and specification optimisation targeted the way the business purchased rather than simply who it purchased from, identifying opportunities across print, postage, penalty notice formats, and uniform specifications to reduce cost without reducing capability. Product harmonisation across all divisions standardised the uniform portfolio, simplifying the demand profile, improving supply continuity, and generating material savings through volume consolidation.

In one of the most innovative workstreams, Curzon worked in close collaboration with suppliers to implement a new consolidated IT device that replaced multiple individual devices, improving agent satisfaction and delivering substantial savings through specification innovation rather than price negotiation alone. A make-versus-buy assessment of services including recruitment identified opportunities to internalise or outsource selectively, with Curzon supporting through both the analysis and the implementation phase.

CASE STUDIES
Read some of the client problems we have solved!

smart manufacturing

From Bespoke to Blueprint: Compressing a 19-Day Production Cycle to 10 and Saving £0.5m Per Cycle

Outcomes

Cycle time was compressed from a best-demonstrated performance of 19 days to a sustained average below the 14-day target, and as low as 10 days. Each cycle reduction generated associated cost savings of approximately £0.5 million, with savings accumulating across a programme that had previously been haemorrhaging cost through extended plant leases and repeated delays. The client noted that having Curzon embedded within the project proved highly effective, with pragmatic, tailored interventions and a test-and-learn approach that encouraged genuine adoption and ownership across the project team.

Our Client

A major UK civil engineering contractor delivering a complex marine infrastructure programme that had fallen over a year behind plan. The project involved technically demanding marine engineering operations with expensive plant on extended lease, where every day of delay carried a direct and significant cost. The programme had been unable to establish a repeatable, effective delivery model, and the accepted wisdom on site had become that most delays were attributable to weather or one-off events and therefore unavoidable. That assumption needed to be challenged.

Background

Despite significant effort to find a workable engineering solution, the project had consistently failed to meet planned delivery cycle times. The best performance ever achieved was a 19-day cycle against a target of 14 days, and that level of performance was far from consistent. Non-recoverable costs were accruing rapidly through the extension of expensive marine engineering plant leases.

The delivery model itself was part of the problem. The project relied heavily on the experience of individual agents, managers, and foremen to manage communication and coordination, without the structure or formality needed to make performance repeatable. Each production cycle had effectively been bespoke, meaning lessons from one cycle were rarely carried forward to the next, and there was no standard process to return to when unplanned events caused deviation.

Curzon Approach

Curzon embedded directly within the project team rather than advising from the outside, a decision that proved critical in a technically complex and fast-moving marine environment where understanding the operational reality was a prerequisite for designing effective interventions.

Working alongside the project team, Curzon identified and implemented an optimal production process with defined task times, giving the project a consistent plan to execute against and measure performance for the first time. Cross-functional short-range planning disciplines were introduced to improve visibility across the operation and reduce the instances of unplanned stoppages caused by poor communication and lack of coordination between functions.

Communication cascades to front-line teams were strengthened to ensure the right plan was being executed at the point of delivery. A process improvement pipeline was prioritised to accelerate implementation of the highest-impact solutions first, and close monitoring was used to highlight avoidable downtime and drive operational fixes such as deck layout standardisation.

Critically, the concept of a standard process was established and maintained. When unplanned events caused deviation, the project now had an agreed sequence to course-correct back to rather than improvising a new approach from scratch. The shift from bespoke to repeatable was the foundation on which all of the cycle time improvements were built.

CASE STUDIES
Read some of the client problems we have solved!

40% Less Inventory, 50% Faster: Redesigning an Aerospace Value Chain From the Ground Up

Outcomes

The engagement identified a 40% reduction in inventory through work-in-progress elimination across the value chain. A 50% reduction in production lead time was confirmed as feasible. Yield performance improved by 10 percentage points through closer process control, and a plan to deliver £5 million in in-year savings was agreed and put into motion. Lean workflow changes were implemented in pilot cells, a continuous improvement programme was launched across the shop floor, and new KPIs replaced the traditional cost absorption metrics that had been masking underperformance.

Our Client

A global precision engineering business manufacturing complex, multi-stage components for the aerospace industry through a casting, machining, and coating operation. Operating in a sector where quality, yield, and delivery performance are critical competitive differentiators, the business faced a value chain that had grown inefficient, inventory-heavy, and culturally resistant to the improvement disciplines needed to restore competitiveness.

Background

Work-in-progress and finished goods inventories had accumulated to levels that were absorbing significant capital and masking the true performance of the operation. Production measures were actively encouraging over-production rather than flow, and process velocity through the multi-stage operation was extremely low, compounded by poor yields and excessive scrap.

A silo mentality across Operations was exacerbating the inventory problem, with functions optimising locally rather than managing the value chain as an integrated whole. The workforce had become disaffected and disengaged from improvement activity, and without effective performance management in place there was no mechanism to change that dynamic. The organisation was caught in a cycle where the metrics used to run the business were reinforcing the behaviours causing it to underperform.

Curzon Approach

Curzon structured the engagement in two connected phases: first, articulating the true operational improvement potential through rigorous current-state analysis; second, designing and piloting the interventions needed to realise it.

The current-state analysis established the business case for change in P&L and cash terms, giving leadership a clear and credible picture of the prize available before committing to a redesign programme. From this foundation, a pilot was designed to create an integrated supply chain for the highest-volume product, pulling in suppliers and joint venture partners to address the full end-to-end value chain rather than the internal operation in isolation.

A pull model was designed in detail, eliminating WIP stages along the entire supply chain to reduce inventory and accelerate flow. The physical layout and organisation of the operation were redesigned to separate dirty and clean processes, directly reducing the rework that had been inflating scrap rates and consuming capacity. Lean workflow approaches were introduced and trialled in pilot cells before broader rollout, reducing implementation risk and building the evidence base for scaling.

A cascaded performance management framework was designed and introduced to replace the cost absorption metrics that had been driving the wrong behaviours, giving the operation a set of KPIs genuinely oriented around value chain performance. A programme of Lean training and continuous improvement projects was implemented to build the shop floor capability and engagement that sustained improvement requires.

CASE STUDIES
Read some of the client problems we have solved!

Restructured for Growth: £4.1m in Savings and a Scalable Operating Model for a Major Waste Division

Outcomes

The redesign delivered projected annualised cost savings of £4.1 million, phased across three implementation stages, with immediate savings of £0.6 to £0.8 million expected in the first quarter following initial changes. The Sales function was realigned to customer needs and geographic segments, sharpening focus on high-value customers. Customer Service was streamlined through improved processes and reduced complaint volumes. The division emerged from the programme with a flexible, scalable operating model positioned for future growth rather than burdened by the legacy of past acquisitions.

Our Client

The Industrial and Commercial division of a major UK waste management business, operating at significant scale across a broad customer base. Since 2019, the division had grown through a combination of organic expansion and acquisition activity, but its operating model had not kept pace. Overhead and management functions had grown proportionally with the business rather than delivering economies of scale, and the accumulated complexity of growth without structural discipline was beginning to create real operational and commercial drag.

Background

The challenges were structural and interconnected. Duplication of functions and overlapping roles were raising costs and creating inefficiencies that showed up in day-to-day ways of working. The absence of standardised, clearly defined roles hampered operational agility and made consistent performance difficult to achieve across the division. Inconsistent operating practices were beginning to affect customer experience, while revenue accountability was misaligned, sitting within Operations rather than Sales, creating confusion about where commercial ownership resided.

The division needed more than a cost reduction exercise. It needed a coherent redesign that would eliminate duplication, clarify accountability, and build the structural foundations for sustainable growth.

Curzon Approach

Curzon worked with divisional leadership across the full scope of the redesign, developing a structured set of initiatives that addressed the cost base and the operating model simultaneously rather than treating them as separate problems.

The organisational structure was redesigned to eliminate duplication and establish clear roles and responsibilities across the division. The Sales function was restructured under a unified strategy, with revenue accountability shifted from Operations to Sales to bring commercial ownership in line with commercial activity. Administrative tasks within Sales were centralised to reduce inefficiencies and free up the sales force to focus on customer-facing activity.

Customer Service was streamlined through a combination of process improvement and complaint volume reduction, reducing the headcount required without compromising service quality. New roles focused on operational excellence, route planning efficiency, and fleet utilisation were introduced to strengthen the operational core of the division.

Throughout, a phased implementation approach was developed to sequence the changes in a way that minimised disruption to the business while delivering early savings that would build momentum and demonstrate progress to the Board. The result was a division structurally reset for the next phase of its growth, with the clarity, accountability, and scalability it had previously lacked.

CASE STUDIES
Read some of the client problems we have solved!

From Worst to Exemplar: A €50m Profit Turnaround at Europe's Largest Automotive Glass Producer

Outcomes

The engagement delivered a profit turnaround of approximately €50 million over three years, transforming the site from persistent underperformer to one of the top performers within the group. Overall Equipment Effectiveness improved by 40% without any additional capital expenditure. Working capital was reduced by 25% on a sustained basis, even as demand increased. Line changeover times were cut from seven hours to three. The site was established as a group-wide exemplar of best operating practices, re-establishing its position as a market-leading producer.

The engagement was recognised as Best International Project by the UK Management Consultancies Association. The Divisional CEO said: “We wanted a step change in performance, done in a way that would build capability to make it sustainable. The results speak for themselves.”

Our Client

The largest integrated automotive glass production site in Europe, operating as part of a major international manufacturing group. The site had suffered a sustained period of underperformance, with declining productivity, excessive working capital tied up in finished and obsolete stock, and significant plant downtime threatening its just-in-time delivery model in a highly competitive, fast-paced market. Previous improvement attempts had repeatedly failed to take hold in a deeply embedded, change-resistant culture. The future viability of the site was genuinely at stake.

Background

The scale of the challenge was matched by its complexity. Poor asset management and maintenance routines were causing significant unplanned downtime, while capital expenditure requests were being made without the performance data needed to justify or prioritise them. There was no effective performance management framework in place, resulting in low and inconsistent productivity across both plant and people. Planning processes were inefficient and uncoordinated, leaving working capital inflated and stock poorly controlled.

Beneath the operational issues lay a cultural challenge that had defeated every previous intervention: a workforce and management community that had learned to accept underperformance as the norm, and that had grown resistant to the kind of change the site urgently needed. Any solution would need to address both dimensions simultaneously.

Curzon Approach

Curzon began with a comprehensive baseline performance analysis to establish the true starting point and identify the improvement levers that would form the foundation of a credible business case. This diagnostic rigour was essential in an environment where previous attempts had failed partly because the problem had never been fully understood before solutions were imposed.

A joint team was created with the client from the outset, maximising knowledge transfer and building ownership of solutions among the people who would be responsible for sustaining them. Rather than managing the transformation from the outside, Curzon worked embedded within the operation, focusing on the critical few KPIs that would unlock the most significant performance and profitability gains.

OEE was identified as the primary lever. Lean performance tools including Short Interval Control and SMED were applied, with a deliberate focus on first-line leadership as the key to driving lasting behaviour change on the shop floor. Line changeover processes were systematically redesigned, cutting standard times from seven hours to three and releasing latent capacity without the need for additional capital investment.

Improvements were piloted first, demonstrating impact before committing to site-wide rollout, and a repeatable blueprint and playbook were developed to enable scaling both across the site and to other locations within the group. A capital programme review identified where expenditure could be deferred as efficiency gains met capacity needs, removing cost from the investment plan while the operation was still in recovery.

A varied and thorough communication programme ran throughout, engaging the whole workforce in the transformation rather than managing change from above. This investment in hearts and minds was not peripheral to the programme; it was what made the difference in an environment where resistance had previously proven insurmountable.

CASE STUDIES
Read some of the client problems we have solved!

digital customer experience

Making Digital Real: Bringing Commercial Clarity to a Global Engineering Firm's Digital Ambition

Outcomes

The engagement delivered a materially improved understanding of digital commercial models across the regional leadership team, broadening solution owners’ perspectives on the revenue potential of their individual initiatives. Five initial priorities for commercialisation were agreed from a portfolio of twelve solutions under development, providing the focus the business needed to move from incubation to market. Key gaps in understanding were identified and defined, including the detailed business cases and operating model definition needed to support the agreed priorities, with clear next steps established for governance and roadmap development.

Our Client

The Europe, Middle East, and UK segment of a global design and engineering business, with an ambition to become a digital leader in its industry. The organisation had launched a global innovation programme to respond to the digitisation of the design and engineering sector, encompassing automation of cost and commercial management, new data-driven service offerings, and co-creation with clients to define its future role in a digital world. With a target of generating 20% of revenues from digital within three years, the business needed to move beyond innovation for its own sake and develop a credible commercial strategy for monetising its digital portfolio.

Background

Twelve digital solutions were under incubation across the business, but the organisation lacked the commercial framework needed to prioritise, sequence, and bring them to market effectively. The threats and opportunities of digitisation were understood at a strategic level, but the regional leadership team had not yet developed a shared, grounded understanding of how digital business models actually work or how comparable organisations had successfully monetised digital services.

Without that foundation, even well-designed digital solutions risked failing to reach their commercial potential. The gap between innovation and revenue was real, and closing it required both a change in thinking at leadership level and a clear set of commercial priorities to act on.

Curzon Approach

Curzon designed and delivered a leadership workshop to bring digital commercial reality to life for the regional leadership team. Rather than presenting abstract strategy, the session drew on case studies of successful technology companies to illustrate how digital business models actually work and how services are monetised in practice. Traditional and emerging competitor examples grounded the discussion in the client’s own market context.

In parallel, Curzon developed a set of solution canvasses summarising key information and observations across each of the twelve digital solutions currently under development, giving the business a consistent, comparable view of its innovation portfolio for the first time. The twelve solutions were then analysed against four dimensions: potential revenue size, relevance across business lines and service lines, geographic applicability across the region, and stage of development. From this, an initial set of five priorities for commercialisation was proposed and agreed, giving the organisation a clear and defensible starting point for its go-to-market effort.

The engagement closed with an honest identification of the remaining gaps: the detailed business cases still needed, the operating model for monetisation still to be defined, and the governance and roadmap processes required to take the priorities forward. Clarity about what remained to be done was as valuable an output as the decisions already made.

CASE STUDIES
Read some of the client problems we have solved!

Fit for Purpose, Built to Last: Redesigning the Process Foundation of a Fast-Scaling Nuclear Programme

Outcomes

The redesigned processes delivered transformative improvements across the programme. Workflows were tailored to the specific needs of the nuclear development context while aligning fully with project and programme management best practice. Operations became genuinely integrated across business functions and complementary workstreams, eliminating the fragmentation that had previously impeded delivery. A bespoke project classification tool provided project-specific process flows while preserving the flexibility needed for a diverse portfolio. Critically, critical investors in the programme gained materially greater confidence in the organisation’s ability to manage complex projects and programmes at scale.

Our Client

A prominent UK organisation delivering a nuclear power plant design and deployment programme of national significance. Having grown rapidly, the business had inherited a set of project and programme management processes from its parent company that were neither tailored to the demands of a nuclear development programme nor compatible with the organisation’s vision for its future-state operating model. An internal audit had exposed the scale of the problem, creating both an immediate remediation requirement and a longer-term imperative to redesign the process landscape from the ground up.

Background

The processes in place had not been built for this organisation or this context. Inherited from a parent company, they were misaligned with the specific demands of nuclear power development, leading to disconnected workflows, duplication of effort, and bottlenecks in governance and decision-making that an internal audit had formally identified as critical deficiencies.

The consequences were felt both internally and externally. Project execution was impeded, resources were being strained by workarounds and inefficiencies, and stakeholder confidence was being undermined at precisely the moment when the programme needed to be demonstrating delivery credibility to its most critical investors. A rapid response to the audit findings was needed in parallel with a more fundamental rethinking of the entire process landscape.

Curzon Approach

Curzon structured the engagement to address both the immediate and the strategic simultaneously. Urgent audit actions were turned around rapidly, bringing the most critical process gaps into alignment without waiting for the broader redesign to be completed. This parallel-track approach ensured the organisation was not left exposed while the longer-term work progressed.

The process redesign itself began with a comprehensive analysis and benchmarking of the existing process landscape against industry best practice, combined with a detailed maturity evaluation to identify the specific gaps and priorities that would define the redesign agenda. Value stream mapping workshops with over 50 stakeholders captured the current-state picture across both internal and customer-facing processes, surfacing the inefficiencies, bottlenecks, and non-value-adding activities that the redesign needed to eliminate.

A future-state process landscape was then defined and validated through targeted workshops and engagements with senior decision-makers and key end-users, ensuring that the redesigned processes reflected the practical realities of the people who would operate them, not just the preferences of those who commissioned them. Redesigned and agreed procedures were documented and issued through a streamlined governance and change control process managed end-to-end by Curzon.

To maximise the value of the new processes for end-users, a bespoke project classification tool was developed and implemented, enabling tailored process flows for each project type while maintaining a unified, governance-consistent framework across the portfolio.

CASE STUDIES
Read some of the client problems we have solved!